Calculating Construction
Expenses
Example: URD Service with
Line Ext. of 350'
Contribution to Construction $300
Meter Pedestal Unit $600
350 x $5.80/ft $2,030
Normal Cost $2,930
Winter Const. Fee.
350 x $6/ft x 5.80 $4,130
Total Charge $4,130 plus MN State Sales Tax
($268.40)
Road push would be extra if needed.
Single Phase Service - Overhead and Underground Line
Extension Residential:
$300 Contribution to Construction (Covers first
staking trip, administration, processing and
handling of permits).
$5.80 per foot starting at 0 footage.
An additional $9 per foot will be assessed for Road
Push segments (placement of underground lines under
roadways) as defined by ECE. Directional Boring will
be Contractor Estimate.
If construction takes place between November 1 and
April 1, additional winter charges will apply both
to the above footage and the Road Push footage.
Overhead and Underground Single Phase Commercial
Services
$300 Contribution to Construction
$5.80 per foot starting at 0 footage
An additional $9.00 per foot will be assessed for
Road Push segments (placement of underground lines
under roadways) as defined by ECE.
Directional Boring will be Contractor Estimate.
If construction takes place between November 1 and
April 1, additional winter charges will apply both
to the above footage and the Road Push footage.
Platted Residential Single Phase Developments -
Recorded at the County Office
$1,500 Contribution to Construction
$ 5.80 per foot starting at 0 footage
An additional $9 per foot will be assessed for Road
Push segments as defined by ECE.
Directional Boring will be a contractor estimate.
Winter charges apply November 1 to April 1, on both
line footage and Road Push footages.
Platted Developments - Connect Fee Only
$300 Contribution to Construction
Three-phase extension Overhead or Underground
Services over 1,000 KVA
Cost of service will be determined by the
infra-structure needed to service the load.
Overhead or Underground Three phase Service 1,000
KVA or smaller
$1,000 Contribution to Construction
$13.65 per foot
An additional $9 per foot will be assessed for Road
Push segments as defined by ECE.
Directional Boring will be Contractor Estimate.
Winter charges apply November 1 to April 1, on both
line footage and Road Push footages.
Platted Residential Three phase Developments -
Recorded at the County Office
$1,500 Contribution to Construction
$13.65 per foot
An additional $9 per foot will be assessed for Road
Push segments as defined by ECE.
Directional Boring will be Contractor Estimate.
Winter charges apply November 1 to April 1 on both
line footage and Road Push footages.
Platted Industrial Developments - Recorded at the
County Office.
The customer will be billed the installed cost of
the project. An estimated project cost will be
required to be paid before construction begins. At
the completion of construction, the customer will
receive an invoice or refund for the amount over or
under the paid estimate.
Winter Underground Construction Charge:
An additional $6 per trench foot will apply to any
underground construction from November 1 through
April 1. This is non-refundable and applies to both
line footage and Road Push footages.
Underground Service Single Phase:
Option one:
A 200-amp meter pedestal with 200-amp breaker and
GFI is placed within 10' of the transformer on the
lot line or approximately 150' from the structure.
This meter pedestal unit may be purchased from ECE
for $600 in addition to the $300 Contribution to
Construction or from an electrician. The "Request
for Inspection" form is filed by ECE on an ECE
purchased pedestal. Additional line extension
charges will apply if the pedestal is not within 10'
of the transformer.
Option two:
If meter socket is to be located on structure, or by
a mobile or manufactured home, the electrician (or
homeowner) will provide and install an underground
meter socket. Secondary wire is connected to the
meter socket and run to ECE's transformer leaving a
10' coil of wire. The wire must be connected to the
meter socket before ECE will energize the service.
There will be a $300 Connection fee. The "Request
for Inspection" form will be filed by the
electrician (or homeowner) with the State and ECE.
If self-wired, the service must pass electrical
inspection before it will be connected by ECE.
Trip charge: There is a $45 charge for the
second Staking trip. There is a Crew second trip
charge based on a 2 hour Standard (wages & equipment
charges) if service is not ready for connection on
customer-owned secondaries. The applicable trip
charge must be paid before service will be
connected.
Overhead Single Phase service:
Option One:
For service on ECE pole, a 200-amp overhead meter
loop unit with a 200-amp breaker and a GFI
receptacle may be purchased from ECE or from an
electrician. The cost for the meter loop unit is
$600 in addition to $300 Contribution to
Construction. If overhead lines need to be extended,
then additional line extension charges will apply.
The "Request for Inspection" form for the overhead
meter loop unit will be filed by ECE if an ECE meter
loop is used.
Option Two:
If meter socket is to be located on structure, or by
a mobile or manufactured home, the electrician (or
homeowner) will provide and install an underground
meter socket. Secondary wire is connected to the
meter socket and run to the pole leaving at least
30' of wire for ECE to reach top of pole. There will
be a $300 connection fee. The wire must be connected
to the meter socket before ECE will energize the
service. The "Request for Inspection" form will be
filed by the electrician (or homeowner) with the
State and ECE. If self-wired, the service must pass
electrical inspection before it will be connected by
ECE.
Trip charge: There is a $45 charge for the
second Staking trip. There is a Crew second trip
charge that is based on a 2 hour Standard (wages &
equipment charges) if service is not ready for
connection on customer-owned secondaries. The
applicable trip charge must be paid before service
will be connected.
Wisconsin Electrical Inspections: Uniform
Dwelling Code (UDC) requires that all new One and
Two family dwellings require electrical
inspection before service is connected. Contact
municipality or WI Division of Safety and Buildings
608-267-5113 for additional information.
Structures not covered by UDC - A Certificate
of Compliance stating that all electrical work is
compliant with WI State and National Electrical code
is required to be filed with ECE before service can
be connected. This requirement applies to homeowner
or contractor wiring.
Other Options Available:
Customer Secondary Plowing: $13 per foot with
a minimum charge of $2,000. Winter construction
charges will also apply November 1 - April 1.
Right-of-Way Trimming for new service:
Contractor Estimate
Coop Owned Security Light:
Installation:
Overhead Service - On existing ECE pole, $100 charge
$300 if pole required (includes Security Light)
Underground Service - $300 per pole (includes
Security Light) plus $5.80 per foot when underground
conductor is required.
Winter Construction charges will apply.
Easement Recording:
There will be a $75 charge for recording an easement
that is needed for a service.

|